top of page
grad-purple-blue.png

Ioannina: Follower city overview

Methodology

Training

Intervention

Tool

Data

Study

Use case

Municipality of Ioannina

At a glance: Ioannina · Follower city · INN1 · Local rules, docking sites and tender documents ready; procurement next (as of May 2026) · Sources: D6.3, D3.6


Overview

Ioannina is a regional administrative, educational and economic centre in north-western Greece, with a dense urban core. It wanted its first municipal shared e-bike system to offer an alternative to private cars.

Greece has no national framework for shared e-bikes, so each city must adopt its own municipal regulation first. The city's replication plan also notes that its terrain is difficult for micromobility.


Highlights

Code

Intervention

Status (May 2026)

Planned budget

INN1

The city's first shared e-bike system: 3 docking stations, 14 e-bikes and a management platform

Rules, sites and tender documents ready; procurement next

about €170,000


A docking station of the type planned for Ioannina's shared e-bike system.
A docking station of the type planned for Ioannina's shared e-bike system.

  • What was done. The city worked on local rules for shared micromobility, chose and confirmed the docking station locations, and prepared the procurement documents for docks, bikes and software. By early 2026 it had the regulatory, technical and operational basis for the system.

  • The plan. Three docking stations with ten bays each, 14 e-bikes and a smart management platform. The budget covers equipment (€30,000), installation and maintenance (€76,000) and software (€64,000).

  • Who was involved. Eleven stakeholders, including the regional union of disabled people, a local cycling group, the urban bus company, the taxi association, the Chamber of Commerce and hoteliers. A public consultation is required by law before the regulation is adopted.

  • Inspired by. Shared micromobility in Issy-les-Moulineaux, Copenhagen's participation tools, Helsinki's safety work and Trikala's interventions.


Practical relevance

  • Check the legal basis first. Without national rules, Ioannina had to write its own regulation before it could buy anything.

  • Expect the timeline to stretch. The 2025 plan aimed to adopt the regulation by May 2025 and procure equipment by mid-2025; by May 2026 procurement was still the next step.

  • Bring many groups to the table. Operators, businesses, disability and cycling groups all have a stake in a shared system.


Publication details

Based on ELABORATOR deliverable D6.3, Follower Cities Final Implementation Report (Work Package 6, July 2026), edited by Juraj L. Vertlberg and Sanja Ševrović (FPZ), status as of May 2026. Budget, plans and inspirations: D3.6, Twinning inception, replication plans and technical definitions of the Follower cities interventions (May 2025, revised August 2025), edited by Marko Ševrović with Shanna Lucchesi (EIRA). Both public.


Related


Disclaimer: The content of this article may be updated or changed, and this page will be updated if it does.

Full materials

Share this page:

Stay in touch!

Sign up to our mailing list to receive exclusive access to our newsletter and stay up to date with the latest project news and events.

Thanks for submitting!

Elaborator logo
  • LinkedIn
  • X

© 2023 Elaborator

Crafted with ♥️ by Threerooms

Co-funded EU logo

Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them.

Civitas-Logo
EU-Mission-Logo

ELABORATOR is part of the CIVITAS Initiative and contributes to the goals of the EU Mission: Climate-Neutral and Smart Cities

UKRI logo [W].png

UKRI supports UK participants with grant numbers 10078745 (iRAP ) and 10069203 (UBRIS)

bottom of page