Overview
Six Follower cities (Lund, Liberec, Velenje, Ioannina, Split and Kruševac) took ideas from the ELABORATOR Lighthouse cities and adapted them to their own context. D6.3 reports where their nine interventions stood at the end of May 2026.
Progress was uneven: some interventions were running, others were still in procurement or planning. The remaining steps will be reported in D6.4, and impact results in D7.1.
Highlights
Status as of May 2026 (D6.3). Budgets are the estimates the cities set out in their 2025 replication plans (D3.6), not final costs.
City | Intervention | Status | Planned budget |
|---|---|---|---|
Lund | Temporary redesign of a narrow historic street, with sensors | Running steadily since early 2026 | about €25,000 |
Liberec | Camera and sensor monitoring of illegal parking in a housing estate | Running steadily | "small" |
Velenje | Sensors that detect conflicts between road users | Test site working; more sites being chosen | €70,000 |
Velenje | Secure e-bike hub for high-school students | Procurement done; being set up as a pilot | €40,000 |
Velenje | Surveys and a focus group with high-school students | Results analysed and used in the city's mobility plan | minimal |
Ioannina | The city's first shared e-bike system: 3 docks, 14 e-bikes | Rules, sites and tender documents ready; procurement next | about €170,000 |
Split | Cameras against illegal parking that blocks buses and pavements (7 sites) | Procurement ongoing, including an appeal | €225,520 |
Kruševac | Real-time bus information at 4 stops | Specifications being defined | €75,000 |
Kruševac | Brianova Street redesigned as a shared space | Planning and baseline data | about €180,000 |
What the cities learned:
There is no single path. Each city adapted ideas to its own rules, budget and streets.
The same obstacles came up everywhere: procurement delays, making new technology work together, getting the right people around the table, and lining up rules and infrastructure.
Phased planning helped cities keep moving when one part was delayed.
Cooperation is essential between city departments, technical providers, mobility experts, schools and local stakeholders.
Practical relevance
Follower cities are small and medium-sized and work with set budgets. Their experience shows what adapting an idea tested elsewhere looks like in practice, including how long it takes and where it gets stuck. The list gives realistic orders of magnitude for planning a similar intervention.
Publication details
ELABORATOR deliverable D6.3, Follower Cities Final Implementation Report. Work Package 6. Delivered July 2026. Edited by Juraj L. Vertlberg and Sanja Ševrović (FPZ), with contributions from Shanna Lucchesi and Despina Vounasis (EIRA) and the Follower cities. Dissemination level: public.