Split: preparing parking-enforcement cameras with public input

Methodology

Training

Intervention

Tool

Data

Study

Use case

City of Split, with Promet Split and Split Parking

At a glance: Split · Follower city · SPL1 · Contractor selected in April 2025, then appealed; procurement still being finalised (as of May 2026) · Sources: D6.1, D6.3, D3.6


Overview

Split, Croatia's second-largest city, receives many tourists each season. In the Living Lab area, Ulica Domovinskog rata and nearby junctions, illegal parking blocks buses, pavements and crossings.

The city plans cameras with automatic number-plate recognition, starting at 7 of 28 high-priority sites. It works with the public transport company Promet Split, Split Parking and the Ministry of Interior, which must approve the system.


A planned enforcement camera location in Split.
A planned enforcement camera location in Split.

Highlights

  • Testing the market first. Before ELABORATOR's implementation phase, a public call brought in companies for a 40-day on-site demonstration. What the city learned shaped the technical specifications.

  • Asking many groups. About 140 people attended the Smart City Split conference in November 2024, and 60 answered a survey. From December 2024 to March 2025, surveys reached city staff (53), police (14), mobility companies (12), civil society organisations (6), traffic engineers (3), professional associations (3) and district councils (2).

  • What they said. 93% of police respondents expected cameras to improve safety significantly. Transport companies saw cameras as effective only with stricter enforcement. City staff stressed education campaigns, and district councils felt left out of decisions.

  • Workshops in May 2025. With the NGO ODRAZ, the city held a World Café with about 20 people from the city, police, operators, NGOs and residents, including a person with a disability. It also held a public roundtable and a workshop with 33 students from three secondary schools. The students said buses had improved a lot recently and asked for better bike infrastructure, greener spaces, safer school zones and campaigns aimed at young people.

  • The main recommendation. Explain what is happening, and why, before cameras and enforcement start. The city plans to begin with a well-communicated pilot zone and to address camera placement and data privacy.

  • The procurement. The tender opened on 19 February 2025; three bids came in and a contractor was selected on 24 April. On 2 May, two unsuccessful bidders appealed to the State Commission for public procurement, and contracting was suspended. As of May 2026 the city was still finalising procurement. Meanwhile, it installed barriers against illegal parking at some locations in April 2025.


Practical relevance

  • Test the market before writing specifications. A short demonstration showed what the technology can do.

  • Allow for appeals. A challenge can freeze a contract for months; build that into the timeline.

  • Inform before you enforce. Every group asked for clear public information first.

  • Include those who feel left out. District councils and young people had views the city had not heard.

  • Prepare for privacy questions. Cameras need police approval and must follow data protection law.

  • Compare offers. The selected bid was €225,520 including VAT; two others exceeded €350,000.


Publication details

Based on ELABORATOR deliverable D6.1, Follower Cities Initial Implementation Report (Work Package 6, July 2025), edited by Juraj Vertlberg and Sanja Ševrović (FPZ), including its consultation annexes. Status: D6.3, Follower Cities Final Implementation Report (July 2026, FPZ), for the status as of May 2026. Plans and budget: D3.6, Twinning inception, replication plans and technical definitions of the Follower cities interventions (May 2025, revised August 2025, EIRA), for budget and plans. All public.


Related


Disclaimer: The content of this article may be updated or changed, and this page will be updated if it does.

Full materials

Share this page:

Stay in touch!

Sign up to our mailing list to receive exclusive access to our newsletter and stay up to date with the latest project news and events.

Thanks for submitting!

Elaborator logo
  • LinkedIn
  • X

© 2023 Elaborator

Crafted with ♥️ by Threerooms

Co-funded EU logo

Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them.

Civitas-Logo
EU-Mission-Logo

ELABORATOR is part of the CIVITAS Initiative and contributes to the goals of the EU Mission: Climate-Neutral and Smart Cities

UKRI logo [W].png

UKRI supports UK participants with grant numbers 10078745 (iRAP ) and 10069203 (UBRIS)

bottom of page