
At a glance: Lund · Follower city · LND1 · Temporary redesign and sensors in place; monitoring running steadily since early 2026 (as of May 2026) · Sources: D6.1, D6.3, D3.6
Overview
Östra Mårtensgatan and the square next to it, in Lund's medieval centre, form the city's pilot site. The narrow street has to serve pedestrians, cyclists, cars and buses. Cars took up much of the space, paths for walking and cycling were narrow or unmarked, and drivers went the wrong way in the one-way section.
Parts of the street will be rebuilt in the future, so the city used temporary changes to test ideas that can shape the permanent design. The work supports Lund's mobility plan, which aims for 75% of trips to be made by sustainable modes and for serious injuries to be halved by 2030.

Highlights
Two kinds of sensors. From summer 2024, camera-based sensors with AI counted and classified traffic and measured parking use, with a focus on spaces for people with disabilities. Their data reaches the city's Yggio platform every five minutes. Simpler battery sensors, quick to install on a larger scale, track noise, air quality, temperature and humidity. Installation was completed in summer 2025, after delivery delays.
Small physical steps. New signs against wrong-way driving went up in May 2025, followed by further signs, traffic rules and street adaptations.
Listening to older women. On 23 April 2025, women over 65 took part in a focus group with a presentation, an exploratory walk led by Linköping University and a round-table discussion. They asked for more greenery, clearer signs for parking and driving directions, and clearer marking of where bike lanes and pedestrian zones begin and end. They did not feel very safe there. The city judged these ideas feasible at low cost and plans to follow them up in the design.
A route app. In February 2025, Linköping University started developing an app that evaluates walking routes for individual users.
First observations. The city reports that people followed traffic rules more closely and that pedestrians' and cyclists' movements became easier to predict. These are early observations; impact results will come in D7.1.
Practical relevance
Test before you rebuild. Where a street will be redesigned anyway, temporary changes let you try ideas cheaply.
Mix sensor types. AI cameras for traffic, and cheap battery sensors to cover more places for environmental data.
Check privacy rules first. Every sensor had to be assessed against GDPR and Swedish privacy and camera-surveillance law.
Give people something to react to. At the focus group, little could be adjusted because no design was ready yet; only the challenge and the site had been decided.
Plan for delays and data links. Late sensor deliveries shifted the schedule, and connecting sensors, the app and city systems needed close teamwork.
Cost. The planned budget was about €25,000. The city will consider using the cost-efficient sensor approach elsewhere.
Publication details
Based on ELABORATOR deliverable D6.1, Follower Cities Initial Implementation Report (Work Package 6, July 2025), edited by Juraj Vertlberg and Sanja Ševrović (FPZ), including its consultation annexes. Status: D6.3, Follower Cities Final Implementation Report (July 2026, FPZ), for the status as of May 2026. Plans and budget: D3.6, Twinning inception, replication plans and technical definitions of the Follower cities interventions (May 2025, revised August 2025, EIRA), for budget and plans. All public.
Related
Disclaimer: The content of this article may be updated or changed, and this page will be updated if it does.
Full materials
Share this page:
