
At a glance: Ioannina · Follower city · INN1 · Draft regulation put to public consultation (June–July 2025); procurement documents prepared, procurement next (as of May 2026) · Sources: D6.1, D6.3, D3.6
Overview
Greece has no national framework for e-bikes and other shared micromobility, so each city must adopt its own municipal regulation, with a mandatory public consultation. Ioannina, by Lake Pamvotis and surrounded by mountains, faces high car dependency, illegal parking and little micromobility.
The city plans its first shared e-bike system: three docking stations with ten bays each, 14 e-bikes and a management platform. Before buying anything, it had to write and consult on the rules.

Highlights
Mapping who matters. The city identified 11 stakeholder groups, from the urban bus company and taxi owners to hoteliers and a local cycling group. It described the regional union of disabled people as a "very critical stakeholder" to make sure "no-one stays behind".
Consultation in the open. The draft regulation was published for online consultation in June and July 2025. Two "mobility picnic" workshops by the lake, on 15 June and 19 July, presented the draft and then the consultation results. Speakers included the bus company, taxi owners, cyclists and the disability union, which spoke on "mobility without exclusion".
Disability groups changed the tender. After the discussion, the team decided to change the procurement terms to add two e-bikes for people with disabilities, and researched suitable models. Stakeholders agreed.
Other answers. Participants asked for safe, connected bike lanes; the city pointed to lanes planned in its urban strategy, funded by the EU. They asked for open data; the city plans one platform for micromobility apps. Older people can use the scheme, as there is no upper age limit, but no special provisions have been made yet.
Where it stands. By early 2026, the city had the regulatory, technical and operational basis for the system. Procurement is the next step.
Practical relevance
Check the legal basis first. Without national rules, writing a local regulation came before any purchase.
Use the mandatory consultation as a design tool. It led to a concrete change in what the city will buy.
Write rules that encourage use. The city's aim was for the rules to support users and operators, not hold them back.
Adapt locally. The plan suggests switching the system off in bad weather and incentives such as one free hour a day.
Expect delays. The 2025 plan aimed to approve the regulation by May 2025; by May 2026 procurement was still to come.
Cost. The planned budget is about €170,000: €30,000 for equipment, €76,000 for installation and maintenance and €64,000 for software.
Publication details
Based on ELABORATOR deliverable D6.1, Follower Cities Initial Implementation Report (Work Package 6, July 2025), edited by Juraj Vertlberg and Sanja Ševrović (FPZ), including its consultation annexes. Status: D6.3, Follower Cities Final Implementation Report (July 2026, FPZ), for the status as of May 2026. Plans and budget: D3.6, Twinning inception, replication plans and technical definitions of the Follower cities interventions (May 2025, revised August 2025, EIRA), for budget and plans. All public.
Related
Disclaimer: The content of this article may be updated or changed, and this page will be updated if it does.
Full materials
Share this page:
