
Overview
Six Lighthouse cities defined 20 interventions in ELABORATOR. Each has a short code used in all project reports: CDM for Milan, CPHK for Copenhagen, FVH for Helsinki, ISSY for Issy-les-Moulineaux, AYZG for Zaragoza and ETRIK for Trikala. Use this list to find an intervention and see how far it had got.
Highlights
Status as reported in D5.2 (July 2026), updated with D5.4 (October 2026) where noted.
Code | Intervention | Status |
|---|---|---|
CDM1 | Accessible crossings on the Olympic routes, with sensors for blind people | Implemented; being extended |
CDM2 | West Axis vision and a tactical street test on Via Novara | Event held; vision is a concept |
CDM3 | Barrier-mapping and decision support tool on OpenStreetMap | In use; web app is a mock-up |
CPHK1 | 525 of 825 street parking spaces removed in the Medieval City | Implemented, permanent |
CPHK2 | Bicycle parking on the freed space | Implemented |
CPHK3 | One-way traffic change and a near-miss survey tool | Implemented |
FVH1 | Safety survey and sensor-equipped e-scooters | Carried out and analysed |
FVH2 | Better parking for shared e-scooters | New 2026 pilot completed, impact evaluation of new parking management done |
FVH3 | Warning system at a tram crossing | Pilot evaluated; not kept in this form |
ISSY1 | Light-emitting road marking for cyclists | Operational; evaluation ongoing |
ISSY2 | Mobility observatory | Operational (October 2026) |
ISSY3 | GECO AIR app for behaviour change | Tested internally; simplified before opening to citizens (D5.2, July 2026) |
AYZG1 | School streets co-designed with children | Implemented (October 2026, D5.4) |
AYZG2 | Pedestrian streets by the Romareda stadium | One street closed; full redesign approved |
AYZG3 | Safer tram crossing at Miguel Servet Hospital | Sound warnings installed; redesign planned |
AYZG4 | Secure parking for private bikes and personal vehicles | Not implemented |
ETRIK1 | Smart crossing near a primary school and the military school | Installed, permanent |
ETRIK2 | Three park-and-ride stations with municipal bikes | Installed |
ETRIK3 | Redesigned cycle lanes with 22 sensors | Installed |
ETRIK4 | SMARTA2 mobility app | Integrated into city services |
Practical relevance
Use the code to find the same intervention in any ELABORATOR report or Knowledge Hub article. The status shows how far each intervention had got, not whether it worked: impact results will come in D7.1, the project's evaluation report.
Publication details
Intervention codes and definitions: ELABORATOR deliverable D3.5, Technical definitions of the Lighthouse cities interventions – version II (Work Package 3, May 2025), edited by Isaac Farradellas and Oriol Biosca (MCRIT) with the Lighthouse cities. Status: deliverable D5.2, Lighthouse Cities Implementation Final Report (Work Package 5, July 2026), edited by VTT. Both public.
Related
Disclaimer: The content of this article may be updated or changed, and this page will be updated if it does.
Full materials
Share this page:
