top of page
grad-purple-blue.png

Helsinki: Lighthouse city overview

Methodology

Training

Intervention

Tool

Data

Study

Use case

Forum Virium Helsinki, with the City of Helsinki

At a glance: Helsinki · Lighthouse city · FVH1, FVH2, FVH3 · Safety survey and e-scooter sensor pilot analysed; new e-scooter parking pilot running; light-rail crossing warning pilot completed (as of July 2026) · Sources: D5.2, D3.5, D5.4


Overview

Helsinki's work in ELABORATOR focused on traffic safety, and especially on accidents involving pedestrians and cyclists that never appear in official records. Improving the safety of junctions is one of the priorities of the Helsinki Traffic Safety Programme 2022–2026.

Forum Virium Helsinki led the work with the City of Helsinki's traffic system planning team. The interventions took place in three settings: across the whole city, in the Kallio district, and at a crossing in Viikki on the new Raide-Jokeri light-rail line, which opened in October 2023.


Highlights

Code

Intervention

Status (July 2026)

FVH1

Citizen safety survey and sensor-equipped shared e-scooters

Survey (1,778 responses, autumn 2024) and e-scooter data (from June 2025) analysed

FVH2

Better parking for shared e-scooters in Kallio

2025 pilot did not reach its goal; most new parking spaces in place and a new pilot running (June 2026)

FVH3

Warning system at a light-rail crossing

One-year pilot from May 2025 completed; the city will not keep it in this form


An e-scooter parking sensor from the 2025 pilot, under the metro tracks near the Redi shopping centre, August 2025.
An e-scooter parking sensor from the 2025 pilot, under the metro tracks near the Redi shopping centre, August 2025.

  • Finding risky places (FVH1) and the crossing warning (FVH3). Both are described in detail in their own case articles: finding risky places and the tram-crossing warning.

  • E-scooter parking (FVH2). A field study in June 2024 mapped where e-scooters were parked badly in Kallio. The city used it to plan new designated parking spaces, and by June 2026 most were in place. There are now about 500 designated parking areas inside the city's extended restriction zone.

  • A pilot that did not work. The 2025 digital parking pilot installed 24 sensors but did not reach its goal. E-scooter operators did not commit to taking part, and because operations in Helsinki were not based on a tender, neither the city nor Forum Virium Helsinki could require them to. A new computer-vision pilot, Parking Monitor, started in May 2026 with Emblica Oy; its results will be reported in D7.1.

  • Modelled (D5.4). A simulation of the crossing warning found it could cope with 20% more trams if each warning were 20% shorter, but not with 40% more trams.


Practical relevance

  • Check your leverage over operators. Without a tender or licence conditions, a city cannot make shared-mobility operators join a pilot. New micromobility licences in Finland from early 2026 give cities more tools.

  • Spot changes in commitment early. The team noted that not all challenges and changes in stakeholder commitment were identified early enough.

  • Combine what people report with what is recorded. Survey reports and accident records found different risky places, and both matter.

  • Allow time for infrastructure pilots. The crossing warning took well over a year from planning to installation.


Publication details

Based on the Helsinki chapter of ELABORATOR deliverable D5.2, Lighthouse Cities Implementation Final Report (Work Package 5, July 2026), contributed by Forum Virium Helsinki with the City of Helsinki and edited by Merja Penttinen, Anu Tuominen and Johannes Mesimäki (VTT). Intervention definitions: D3.5, Technical definitions of the Lighthouse cities interventions – version II (May 2025), edited by MCRIT. Simulation: D5.4, Lighthouse Cities Interventions Validation (October 2026), edited by Alexandros Liazos (ICCS). All public.


Related


Disclaimer: The content of this article may be updated or changed, and this page will be updated if it does.

Full materials

Share this page:

Stay in touch!

Sign up to our mailing list to receive exclusive access to our newsletter and stay up to date with the latest project news and events.

Thanks for submitting!

Elaborator logo
  • LinkedIn
  • X

© 2023 Elaborator

Crafted with ♥️ by Threerooms

Co-funded EU logo

Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them.

Civitas-Logo
EU-Mission-Logo

ELABORATOR is part of the CIVITAS Initiative and contributes to the goals of the EU Mission: Climate-Neutral and Smart Cities

UKRI logo [W].png

UKRI supports UK participants with grant numbers 10078745 (iRAP ) and 10069203 (UBRIS)

bottom of page